Tunnel boring machineFIJALO-POLAND
ALUSTEER
Tunnel boring machine
FIJALO-POLAND
ALUSTEER
VB IVA no incluído
EUR 20.000
Año de fabricación
2025
Estado
Nuevo
(totalmente funcional)
Ubicación
Gdańsk 

Datos básicos
- Descripción de la máquina:
- Tunnel boring machine
- Fabricante:
- FIJALO-POLAND
- Modelo:
- ALUSTEER
- Año de fabricación:
- 2025
- Estado:
- nuevo
- Funcionalidad:
- totalmente funcional
Precio y ubicación
VB IVA no incluído
EUR 20.000
- Ubicación:
- Gdańsk, Polonia

Llamar
Detalles técnicos
Dimensiones y peso
Peso total:
105 kg
Detalles de la oferta
- ID del anuncio:
- A20552370
- Actualización:
- última actualización el 06.03.2026
Descripción
What is controlled jacking?
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
Bodpfxexxhzwe Aqxslp
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Controlled jacking is a trenchless technology that allows underground installations—such as water pipes, sewage pipes, power cables, electrical cables, telecommunications cables, fiber optic cables, water pipes, and sewage pipes—to be laid without the need for extensive excavation. The jacking machine is hydraulically driven and equipped with a pilot head that can be used to correct the path of the jacking.
Thanks to measuring systems, the operator controls the depth and direction of the jacking, which allows for high precision, even with passages several dozen meters long, in situations where accuracy and precise avoidance of obstacles in the terrain are important in order not to damage the existing infrastructure and to safely bypass it.
This solution is particularly valued in places where earthworks are difficult or impossible, e.g., under roads, lawns, tram tracks, parking lots, sidewalks, or urban areas.
Why use controlled pipe jacking?
Controlled pipe jacking is an alternative to traditional excavation, eliminating the need to dig up the surface. This method significantly reduces the time needed to complete the project, lowers the cost of restoring the site to its original condition, and minimizes the impact on traffic and the environment.
The most important advantages of controlled pipe jacking technology:
Bodpfxexxhzwe Aqxslp
- no need to interfere with above-ground infrastructure,
- the ability to work under obstacles (e.g., roads, sidewalks, lawns, property entrances, railroad tracks),
- reduction of noise,
- vibrations, and environmental pollution,
- high route accuracy,
- quick mobilization of equipment and short completion time,
- lower risk of collision with existing installations.
- no need to use bentonite slurry,
- no spoil during jacking
Thanks to these features, controlled jacking is commonly used in the construction of municipal networks, water and sewage connections, gas, fiber optic and cable connections.
Application of controlled jacking
Controlled jacking is ideal wherever installation is required without disrupting the surrounding area.
The most common applications for jacking machines are:
- crossings under roads and streets with heavy traffic,
- jacking under railway and tram tracks,
- crossings under watercourses and canals,
-installations under sidewalks, parking lots, squares, and industrial areas,
- connections to properties without digging up the entire area.
With the ALUSTEER product, no drilling mud (bentonite) is used, which significantly reduces implementation costs and environmental impact.
This technology can be used both in cities and in non-urban areas – wherever precision, speed, and reduced impact are important.
Accuracy and direction control
Modern jacking machines use sensors that enable continuous monitoring of the head position. The operator tracks the parameters on the receiver and operator tablet and reacts in case of deviations from the planned route.
Such solutions ensure:
- high precision of the breakthrough,
- safety for the existing infrastructure,
- repeatability and predictability of results.
In practice, deviations from the jacking axis are usually no more than a few centimeters, which is fully acceptable in most projects.
Proveedor
Nota: Regístrese gratis o inicie sesión, para ver toda la información.
Registrado desde: 2025
1 Publicidad en línea
Enviar solicitud
Teléfono & Fax
+48 534 9... mostrar
También puede estar interesado en estos anuncios.
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Oberaschau
12.251 km
Grúa móvil
LiebherrLTM 1040-2.1
LiebherrLTM 1040-2.1
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Österreich
12.297 km
Doublebeltpress
KreuzmayrK2B 1250
KreuzmayrK2B 1250
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Most Na Soci
12.160 km
Granalladora de mesa DB 1200x500
Siapro d.o.o.DB 1250x500, 1x7.5kW
Siapro d.o.o.DB 1250x500, 1x7.5kW
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Crailsheim
12.135 km
Manipulador telescópico
ManitouMT 730H
ManitouMT 730H
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Gilze
12.019 km
Volvo FH16 650 8x4 / grúa de 115 tm / tractora
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
VolvoFH16 650 8x4 / 115 tm CRANE / KRAN / TRACTOR
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Kaufungen
12.254 km
Fresadora de bancada móvil
KEKEISEN1200/8
KEKEISEN1200/8
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Alemania
12.293 km
Torno CNC
MONFORTSRNC 200 A
MONFORTSRNC 200 A
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Veghel
12.054 km
Grúa
BKRS Portaalkraan Gantry CraneDPL-21-50
BKRS Portaalkraan Gantry CraneDPL-21-50
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Bovenden
12.293 km
Maquinaria agrícola
verschiedene Reifen 17,5 bis 24 Zoll, ca. 1.000
verschiedene Reifen 17,5 bis 24 Zoll, ca. 1.000
Con éxito:
Su mensaje ha sido enviado.
Clasificado
Othmarsingen
11.909 km
Grúa montada en camión
MANTGS 41.480 10x4 Efffer 955 7+6 (855)
MANTGS 41.480 10x4 Efffer 955 7+6 (855)
Su anuncio ha sido borrado con éxito
Se produjo un error






























































































































